Si-95 Test Operation
Test Operation Inverter K Series 53
<Settings of switches on the PC board adaptor>
Outdoor unit external control adaptor
<Changeover by cool/heat central remote controller>
<Switch settings on adaptor printed circuit board>
SS1 (BOTH is selected when demand
control is carried out at the same
time.)
SS2
DS1·2
BOTH C / H DE
C / H
(SL302)
OFF ON
OFF
(SL303)
SS1 (When demand control is used
together, set the switch to BOTH)
SS2
DS1·2 For individual control, do not use the same address twice.
BOTH C / H DE
Cool
(SL305)
OFF ON
ON
(SL306)
SI-95.BOOK Page 53 Friday, March 31, 2000 10:59 AM