Si-95 Test Operation
Test Operation Inverter K Series 53
<Settings of switches on the PC board adaptor>
Outdoor unit external control adaptor
<Changeover by cool/heat central remote controller>
<Switch settings on adaptor printed circuit board>
■SS1 (“BOTH” is selected when demand
control is carried out at the same
time.)
■SS2
■DS1·2
■SS1 (When demand control is used
together, set the switch to “BOTH”)
■SS2
■DS1·2 For individual control, do not use the same address twice.