Example: Increasing load, equal P load sharing to avoid exceeding maximum
1
100
20
60
0
40
80
165
185
175
195
Power
[%]
Load
[kW]
Time
s1
s2
s3
2
3
4
A
G
B
G
C
G
Parameters
s1 = Asymmetric P load sharing Maximum
s2 = Load-dependent start
s3= Asymmetric P load sharing Set point
Points on graph
1. Genset A runs at its asymmetric P load sharing set point, and the load
on Genset B varies.
2. Genset B reaches the asymmetric P load sharing maximum. The power
management system shares the load equally between Genset A and
Genset B.
3. The load increases. The load on the gensets exceeds the load-
dependent start, and the power management system starts Genset C.
4. Genset C is connected and starts taking load. Genset A and Genset B
can run at their asymmetric P load sharing set point, while the load on
Genset C varies.
DESIGNER'S HANDBOOK 4189340911K UK Page 253 of 521