Figure 113. Installing power interposer board
Next steps
1 Install PSUs.
2 Install the air shroud.
3 Follow the procedure listed in After working inside your system.
Related link
Installing a power supply unit
Installing the air shroud
Control panel
A control panel allows you to manually control the inputs to the server.
Your system supports:
• Left control panel: Left control panel contains status LEDs, system ID button, and iDRAC Quick Sync 2 (optional).
• Right control panel: Right control panel contains power button, USB 2.0 ports, VGA port, micro USB for iDRAC Direct, and status LED 
for iDRAC Direct.
Removing the left control panel
Prerequisites
1 Follow the safety guidelines listed in Safety instructions.
2 Follow the procedure listed in Before working inside your system.
3 Remove the air shroud.
Installing and removing system components
159