EasyManua.ls Logo

Dinolift 240RXT - Measures at End of Working Day

Dinolift 240RXT
113 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DINO 240RXT
34
15 MEASURES TO BE TAKEN AT THE END OF THE WORKING DAY
1. Retract the telescope boom completely.
2. Check that the platform is perpendicular to the boom.
3. Lower the boom/platform onto the support on the chassis.
- the limit switch on the transport support prevents operation of the support outriggers if
the platform is not down
4. Close the cover on the platform control panel.
5. Turn the key switch to position “0”.
6. Make sure that the covers are locked.

Table of Contents

Other manuals for Dinolift 240RXT

Related product manuals