18.7 TEST LOADING INSTRUCTIONS FOR REGULAR INSPECTION
1. Place the lift on an even surface with good carrying capacity. Drive the outriggers to their lowest
position (the minimum support width).
2. Raise the boom, turn it to the side from the transport support and lower it to the ground.
3. Put a weighed load of 215 kg on the platform (I).
4. Lift the boom to as high as it goes and extend the telescope to its full length (maximum lifting
height).
5. Lower the boom until the safety device stops the movement.
6. Turn the boom round over 360°.
7. Retract the telescope and lower the boom to a horizontal position.
8. Extend the telescope until the safety limit switch RK4 stops the movement. Establish the standing
stability in this situation by turning the lift round over 360°.
9. Carry out the same procedure with a platform load of 80 kg (II).
10. Compare the outreach with the reach diagram. If necessary, readjust according to instructions in
point "Adjustment of the outreach and overload limit switches".
After the above mentioned test loadings (case I and case II) and the subsequent inspection have been
completed without finding any defects in the structure or stability of the lift, the lift may be used inside
the permitted operating range presented in the reach/platform load diagram of this manual.
The max. allowed platform load is 215 kg
- in conjunction with the first, i.e. start-up inspection, the lift shall be subjected to a test loading
with an overload of 25% and after that the supporting structures shall be thoroughly inspected
- in conjunction with every annual inspection the lift shall be subjected to a test run with
maximum permissible load and after that the supporting structures shall be thoroughly inspected
- the first inspection shall be recorded in the start-up inspection protocol and the test-run shall be
recorded in the protocols for the annual and regular inspection