EasyManua.ls Logo

Dinolift 240RXT - Preparing Lift for Transport

Dinolift 240RXT
113 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DINO 240RXT
35
16 PREPARING THE LIFT FOR TRANSPORT
1. Retract the telescope boom completely.
2. Check that the platform is perpendicular to the boom.
3. Lower the boom/platform onto the support on the chassis.
- the limit switch on the transport support prevents operation of the support outriggers if
the platform is not down
4. Lift the support outriggers.
5. Turn the selector switch to position 0 and disconnect the lift from the power supply.
6. Make sure that the covers are locked.
No load allowed on the platform during towing of the lift.

Table of Contents

Other manuals for Dinolift 240RXT

Related product manuals