EasyManua.ls Logo

Dinolift 240RXT - Long-Term Storage

Dinolift 240RXT
113 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DINO 240RXT
40
EVERY 50 HOURS
1. Bearings of the safety device
2. Bearings of the outrigger cylinders
3. Bearings of the outriggers
4. Bearings of the outrigger foot plates
5. Bearings of the boom and the articulated arms
6. Bearings of the platform
7. Bearings of the levelling cylinders (except the bearing on the rod side of the upper levelling
cylinder)
8. Bearings of the lifting cylinder
9. Sliding surfaces/rolls of the telescope
10. Bearings on the oscillating axle
11. Track rod bearings
TWICE A YEAR
12. Bearing of the telescope cylinder
13. Turning device bearings and gear ring
14. Bearing on the rod side of the upper levelling cylinder
Lubricant Esso Beacon EP2 or equivalent.
The overload protection device joint (point 1) must absolutely be lubricated regularly and always
immediately after the lift has been washed.
Moving parts of the mechanism of the outrigger limit switch system must be lubricated every 50 hours.
Always lubricate the lift and apply a protective grease film immediately after the washing.
Lubricate the visible parts of the Flyer-chains for the boom twice a year. Use Master chain lubricant 1-
4014 or equivalent.
17.4 LONG-TERM STORAGE
Clean the machine carefully, lubricate it and apply protective grease to it before putting it into storage
for a longer period of time. Repeat the cleaning and lubrication procedures while resuming the
operation.
The periodic inspections must be executed following the steps described in the instructions.

Table of Contents

Other manuals for Dinolift 240RXT

Related product manuals