DINO 240RXT
57
Opening pressure of the brakes
- connect the pressure gauge to the measuring point
- during the travelling the pressure shall be 2,5 MPa
11. Check the operating controls on the platform
- check the overall condition of the electric appliances inside the box and spray with moisture
repellent, if necessary
- check the cables and the tightness of the cable clamps
- test the sound signal (23), emergency stop (22), emergency descent (20) and retraction of the
telescope (36)
- test all movements
- test the operation of the oureach limit switch RK4 and the overload limit switch RK5 before
lifting the boom
12. Warning stickers and adhesive tapes
- make sure all warning stickers and adhesive tapes are legible, replace if necessary
13. Repeat the anti-corrosion treatment using e.g. Tectyl 210R anti-corrosion agent
14. Test-run with a load of 80 kg following the loading instructions.
Check the structures after the test-run.
15. Draw up a test protocol, save your own copy and give the other copy to the customer