JT40/JT40 All Terrain Operator’s Manual Systems and Equipment - 181
Pipeloader
7. Remove pipe guide (stored on shuttle drive
cover) and attach to front of pipe loader
frame as shown.
8. Load a pipe in auxiliary pipe loaders and
rest it against pipe guide.
9. Move auxiliary pipe loaders under last row.
10. Raise pipe into last row.
11. Move shuttles all the way out.
12. Repeat steps 8-11 to load more pieces of
pipe into the last row.
13. Move pipe to pipeloader grippers.
• Raise last pipe into last row.
• Move shuttles out.
• Lower pipe into front grippers.
14. Before moving pipe to carriage spindle:
• Close both auxiliary pipe loaders.
• Remove pipe guide and store it on shuttle drive cover.
• Pin lifter covers back in upright position.
• Press left side of auxiliary pipe load restricted operating mode switch to enable drill operator
control of shuttles and lifter.
• Step away from drilling unit.
j59om111w.eps