Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0 13
CChhaapptteerr 44 UUPPSS SSyysstteemm IInnssttaallllaattiioonn
44..11 PPrreelliimmiinnaarryy IInnssttaallllaattiioonn IInnffoorrmmaattiioonn
WARNING
Installation should be performed only by qualified personnel.
Refer to the following while installing the UPS system:
• Review Chapter 3 UPS Installation Plan and Unpacking, for cabinet dimensions, equipment weight,
wiring and terminal data, and installation notes.
• Do not tilt the cabinets more than ±10° during installation.
• Remove conduit landing plates to add conduit landing holes as required.
• If perforated floor tiles are required for ventilation, place them in front of the UPS.
44..22 UUnnllooaaddiinngg tthhee UUPPSS CCaabbiinneett ffrroomm tthhee PPaalllleett
The following tools are required for unloading the cabinet(s):
• 15 mm wrench or socket
• 7 mm nut driver or socket
CAUTION
The UPS and EBM are heavy (see Table 2). Unloading the cabinets requires at least two people to safely
remove the cabinets from the pallet.
To unload three-high cabinets or two-high EBMs, proceed to paragraph
4.2.1 Three-High Cabinets or Two-High EBMs. To unload two-high UPS cabinets, proceed to paragraph
4.2.2 Two-High UPS Cabinets.
44..22..11 TThhrreeee--HHiigghh CCaabbiinneettss oorr TTwwoo--HHiigghh EEBBMMss
To remove a three-high cabinet or a two-high EBM from the shipping pallet:
1. Remove the two M10 bolts securing the stabilizing bracket to the pallet (see Figure 2).