9. For 80-150 kW frame: Locate
and remove the screws from the
relevant cable gland plates for
installing the power cables.
10. For 160-200 kW frame: Locate
and remove the screws from the
relevant cable gland plates for
installing the power cables.
Eaton 93PM UPS 30–200 kVA User's and installation guide
©
Eaton Corporation plc 2017. All rights reserved. Revision: 005 Document ID: P-164000249 53 (126)