Eaton 93PR 60-1200 kW UPS
Installation and Operation Manual
51
Copyright © 2021 Eaton Corporation plc. All rights reserved.
4.6. UPS System Installation (600 kW)
4.6.1. Mechanically joining the Cabinet Sections
NOTE
• For the following steps, verify that the forklift or pallet jack is rated to handle the
weight of the cabinet (see
Table 3-1 Dimensions and Weights
).
• Do not tilt the UPS cabinets more than 10° from vertical or the cabinets may tip over.
1. Remove the front and rear bae Plates of the UPS cabinets. Please keep the bae Plates
and screws for later use;
See Figure 2-3 for the location of the bafe Plates;
2. Use the holes on the feet. Place the UPS cabinets on the ground or channel steel;
See Figure 3-4 and Figure 3-5 bottom view for hole dimensions, For more detailed installation drawings, please
contact customer service to provide;
3. Fix the cabinet foot to the oor or channel steel, reinstall the bae Plates, and use the
M10*25 bolt (16pc)/M10 spring washer (16pc)/M10 large at washer (16pc) removed in step
1 to x it. Torque: 28 Nm;
4. If installing a parallel system, repeat the above steps to all units in the system;
5. Proceed to Section
4.6.2
.