Eaton 93PR 60-1200 kW UPS
Installation and Operation Manual
59
Copyright © 2021 Eaton Corporation plc. All rights reserved.
4.2.1.3. Connect the Signal Cables Of Sync
1. If Sync is selected, need to connect the signal cables between the primary cabinet and the
secondary cabinet. Detail please see
Table 4-3
;
2. Proceed to Section
4.7.2
.
Table 4-3: Signal Cables Connection of Sync
Sync Cable
Primary
Cabinet
Cable Mark
Secondary
Cabinet
Cable Mark
Secondary Cabinet
Cable
Position
Sync bypass IP fuse SYNC SYNC Bypass Input Rear
Sync terminal block P6
P6 MCU PCBA Rear