EasyManua.ls Logo

Eaton 93PR - Instruction for Removing the UPM Module Packaging; Figure 4-6: Instruction for Removing the UPM Module Packaging

Eaton 93PR
143 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eaton 93PR 60-1200 kW UPS
Installation and Operation Manual
45
Copyright © 2021 Eaton Corporation plc. All rights reserved.
4.3. Instruction for Removing the UPM Module Packaging
1. Cut o󰀨 the packing strap and open the carton;
2. Lift the foam on the UPM module upward to remove them;
3. Take out the UPM module.
NOTE
The UPS is heavy. It requires two people for transportation due to its weight.
NOTE
Check whether the UPS is damaged during the process of transportation or not. Should any
damage be observed or parts be found missing, do not start the machine. Contact the forwarder
and distributor immediately.
Figure 4-6: Instruction for Removing the UPM Module Packaging

Table of Contents

Other manuals for Eaton 93PR

Related product manuals