EasyManua.ls Logo

Eaton 93PR - Chapter 4 UPS SYSTEM INSTALLATION; 4.1. Preliminary Installation Information; 4.2. Inspecting and Unpacking the UPS Cabinets

Eaton 93PR
143 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
42
Copyright © 2021 Eaton Corporation plc. All rights reserved.
Chapter 4 UPS SYSTEM INSTALLATION
The customer has to supply the wiring to connect the UPS to the local power source. The electrical installation
procedure is described in the following section. The installation inspection and the initial start-up of the UPS and
installing an extra battery cabinet must be carried out by qualied service personnel such as a licensed service
engineer from the manufacturer or from an agent authorized by the manufacturer.
4.1. Preliminary Installation Information
WARNING
Physical injury or death may follow, or damage may occur to the UPS or the load equipment if these
instructions are ignored.
Refer to the following while installing the UPS system:
Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and installation notes.
Do not tilt the cabinets more than ±10° during installation.
If perforated oor tiles are required for ventilation, place them in front of the UPS.
The UPS unit is not suitable for IT or corner-earthed power distribution systems.
Suitable for mounting non-combustible surfaces only
4.2. Inspecting and Unpacking the UPS Cabinets
NOTE
The UPS cabinet is heavy. If unpacking instructions are not closely followed, the cabinet may
tip and cause serious injury.
Do not stand directly in front of the pallet while unloading the cabinet. If unloading instructions
are not closely followed, the cabinet may cause serious injury.
1. Carefully inspect the outer packaging for evidence of damage during transit
NOTE
Make a visual inspection and check that there are no signs of shipping damages. The ‘Drop&Tell’
indicator on the rear side of the unit shall be intact if the equipment has been handled properly.
2. Use a forklift or pallet jack to move the packaged cabinet to the installation site, or as close as
possible, before unpacking. If possible, move the cabinets using the pallet. Insert the forklift or pallet
jack forks between the supports on the bottom of the pallet.

Table of Contents

Other manuals for Eaton 93PR

Related product manuals