PROline Promass 80 6 Commissioning
Endress+Hauser 49
6 Commissioning
6.1 Function check
Make sure that all final checks have been completed before you start up your measuring
point:
Checklist for “Post installation check Page 22
Checklist for “Post connection check” Page 30
6.2 Commissioning
In the case of measuring devices without a local display, the individual parameters and
functions must be configured via the configuration program, e.g. FieldTool.
If the measuring device is equipped with a local display, all the important device param-
eters for standard operation can be configured quickly and easily by means of the
“Commissioning” Quick Setup menu.
Quick Setup “Commissioning”, Page 50
6.2.1 Switching on the measuring device
Once the function checks have been successfully completed, it is time to switch on the
power supply. The device is now operational.
The measuring device performs a number of power on self-tests. As this procedure
progresses the following sequence of messages appears on the local display:
Normal measuring mode commences as soon as start-up completes. Various measured
value and/or status variables appear on the display (HOME position).
!
Note:
If start-up fails, an error message indicating the cause is displayed.
PROMASS 80
START-UP
Start-up message
SW AMPLIFIER
XX.XX.XX
Current software version (example)
SYSTEM OK
OPERATION
Beginning of normal measuring mode