EasyManua.ls Logo

Engcon EC02 - Maintenance; General Maintenance Intervals

Engcon EC02
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Maintenance
6. Maintenance
6.1. General
Intervals for greasing and inspections to be performed by the user:
- Daily, carried out on all configurations before the machine is put into use for the working
day.
- Every 8 operating hours, lubrication as per lubrication schedule.
- Every 250 operating hours; see section 6.5. Service every 250 operating hours.
In addition to these inspections, a delivery/initial inspection must be carried out by a
specialist after no more than 500 operating hours, and then every 2000 operating hours or
1st year service as per section 11.2. Service record.
Complete the service record, section 11.2. Service record, following each service.
DANGER
Check the attachment points regularly and be alert for
the formation of cracks. Risk of personal injury and
damage to property.
WARNING
Make sure that service and maintenance is carried out
according to the manufacturer's recommendations.
Inadequate maintenance may cause defects on the
base machine and its equipment.
WARNING
When changing hoses, only hoses with press
couplings may be used. Screw connections may
not be used. Risk of personal injury and damage to
property.
IMPORTANT
Review the personal and environmental risks of hydraulic oil
and grease by reading the safety data sheets for the hydraulic
oil and grease in use. Risk of personal injury and damage to
surroundings.
38

Table of Contents

Related product manuals