10. Interface timing when power ON / OFF
RX4111CE Jump to Top / Bottom
ETM62E-02 Seiko Epson Corporation 14
10.2. V
DD
and CE Timing at Power On
When the power is turned to ON, use with CE=Low,V
CL
V in the diagramas illustrated in the following timing chart.
Figure 15 VDD, CE sequence
Table 10 CE Timing
CE voltage when power is
turned to ON
CE impressed voltage
until V
DD
=1.6 V
CE = V
CL
V time when power
is turned to ON
Time to maintain CE = V
CL
until V
DD
=1.6 V
10.2. Restrictions on Access Operations During Power-on Initialization and Recovery from Backup
Because most of RTC registers are synchronized with the oscillation clock of the built-in crystal oscillator, the RTC does
not work normally without the integrated oscillator having stabilized. Please initialize the RTC at the time the power supply
voltage returns (VLF = 1) after the oscillation has stabilized (after oscillation start time t_
STA
).
If intending to access the RTC after the main supply voltage returns, please note following points:
Internal oscillation
(illustration)
t_str
Oscillation start time
(internal oscillation wait time)
Access is enabled
Normal operation start
Minimum voltage for clock maintenance V
CLK
During power-on initialization or power
supply voltage recovery after drop in clock
maintenance voltage
After 30 ms progress, Confirm a state by VLF-bit
At the time of VLF=1: After a t_str wait, initial setting is necessary.
At the time of VLF=0: Register access is possible.
Figure 16 Oscillation start time chart (Power initial supply)