WF-C20590 Installation Guide
Unpacking 13
Unpacking the Bridge Unit
Items needed
Phillips screwdriver
Flathead screwdriver
Minimum workers
3 people
UNPACKING PROCEDURE
1. Pull up on the end of each plastic band to remove them.
Be sure to check the following notes before unpacking:
All workers must read the unpacking procedure together
before starting work.
Wear easy-to-move clothing, gloves, and safety shoes.
Work with care to avoid injuries.
Work with sufficient working space.
Never work with less than 3 people.
Use proper lifting techniques, and stop working
immediately if you feel that the load is too bulky or heavy.