WF-C20590 Installation Guide
Unpacking 17
9. Have two workers lift up the Bridge Unit, while one worker pulls out the pallet
from under it.
10. Gently lower the Bridge Unit to the floor.
11. Remove all protective materials and tape attached to the exterior and inside the
front cover.
When lifting the Bridge Unit, place your hands at the position
indicated. Otherwise, the unit may be damaged.