EasyManua.ls Logo

eqss Gen-3 LMS - Signal Light Installation

eqss Gen-3 LMS
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Signal Light Installation
The signal light warns other workers when the telehandler is lifting loads close to it's
maximum capacity.
Ensure the power supply voltage is greater than 13.5V
otherwise the signal light may not illuminate correctly.
Step Description Diagram
1. Mount the signal light to the top of
the cabin using the magnetic anchor.
View from on top of the cabin
2. Inside the cabin, remove the roof
cover behind the seat leading to the
joystick.
View from drivers seat to the roof
DO001547 VER: 2303241610 23 of 58

Table of Contents

Related product manuals