eqss Gen-3 LMS - Table 16: Finalisation

eqss Gen-3 LMS
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step Description Diagram
5. Operate the boom movement
controls to test if a false N07 fault
occurs.
If a N07 fault does occur, adjust
the arm on the stow switch
forwards towards the stow switch
trigger.
Note: The actual switch arm
orientation may differ from the
picture.
6. Perform a final check on all the
cabling and sensors.
Replace all the covers
Table 16: Finalisation
Complete the system checklist once installation has been
completed.