EasyManua.ls Logo

Extreme Networks ExtremeSwitching X690 Series - Install a V300-8 P-2 T-W Model in a Single or Dual Rack Mount

Extreme Networks ExtremeSwitching X690 Series
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Attach the PSUs directly to the DIN rail:
Figure 251: V300HT-8T-2X DIN Rail Mount with dual XN-ACPWR-60W-HT-DIN PSUs
Install a V300-8P-2T-W Model in a Single or Dual Rack Mount
You need the following tools and materials to install a V300-8P-2T-W model to a rack mount:
ESD-preventive wrist strap
M4 #2 Phillips screwdriver (magnetic screwdriver recommended)
Typical installation for the V300-8P-2T-W model include wall or table installations, in addition to VESA
mounting. In order to rack-mount this model, an accessory mountin kit is required.
To install the V300-8P-2T-W model in a single or dual rack mount kit:
1. Remove all contents of the single rack mount kit (XN-1S-RKMT-V300) or dual rack mount kit
(XN-2S-RKMT-V300).
2. Attach the short mounting brackets (included) to the sides of the port extender using the four
screws (included) for each bracket.
Figure 252: Single Rack Mounting
Figure 253: Dual Rack Mounting
3. Align the holes in the brackets with the rack post holes.
Install a V300-8P-2T-W Model in a Single or Dual Rack
Mount Installing Expansion Modules
312 ExtremeSwitching Hardware Installation Guide

Table of Contents

Related product manuals