4. Commissioning
4-2
Festo P .BE-MPA-EN en 1108e
Contents
4. Commissioning 4-1................................................
4.1 General instructions 4-3.............................................
4.1.1 Before commissioning 4-3....................................
4.1.2 Pressure build-up in the overall supply 4-4......................
4.2 Manual override (MO) 4-6...........................................
4.3 Checking the valves and the valve/actuator combination 4-8...............
4.4 Fitting/removing the manual override caps (optional) 4-13.................
4.5 LE D display of the valves 4-15.........................................
4.6 Commissioning instructions for the proportional pressure regulator 4-18......
4.7 Fault finding 4-20...................................................
4.7.1 Impairment of function 4-20...................................
4.7.2 Operating states of the pneumatic system 4-22...................