5
1 2
3 4
2322
3
The machine heats up until the setpoint temperature is
reached. The heat-through phase then starts, which is indi-
cated on the display. When the display changes from red to
green, the machine is ready for operation.
The CONTURO takes approximately eight minutes to fully heat
up. The thermally isolated gluing unit ensures that the surface
temperature of the machine remains low, thereby eliminating
any risk of burns.
Display information
The display indicates how many metres of edging can
be processed at the preset edging height and glue
quantity. The actual temperature is also displayed.
REMAINING EDGE LENGTH
ARROW BUTTONS
FEED SPEED
MODE
TEMPERATURE IN °C OR °F
TEMPERATURE SETTING
GLUE QUANTITY
TIP You can also adjust the temperature individually: press
the mode button until the temperature indicator flashes, set
the desired temperature using the arrow buttons and press
OK to confirm.
GLUE QUANTITY Page 61
For adapting the glue quantity Chapter 5
SWITCHING UNITS
The display can be switched from Celsius to Fahrenheit and
metres to feet.
2014_FES_EN_CONTURO.indb 23 11.12.13 11:51