EasyManua.ls Logo

flamco Flamcomat G4 - Maintenance Schedule and Procedures

flamco Flamcomat G4
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual Flamcomat G4 + Flamcomat Starter G4
We reserve the right to change designs and technical specifications of our products.
38
ENG
8.1 Vessel draining/refilling.
If draining of expansion water in the main vessel or auxiliary vessels is necessary, please consider the following
order of actions:
Record the actual volume level (%) as shown on FLEXTRONIC control unit display.
Switch the control unit OFF (hold O/I button for 8 seconds).
Close the lockshield valves on the expansion pipe (system inlet and outlet) and on the connecting array (vessel
inlet and outlet)
Close the isolating valve at the top-up connection.
Carry out the required work on the vessel (drain, service, repair etc.).
Switch the control unit ON; Login and go to factory reset* and run Commissioning procedure (overview menu
options; Commissioning 1-1.8)
Aer commissioning the Initial filling procedure is started automatically.
Note: when a refill bigger than the default setting for minimum vessel filling volume is required (6%), please
switch o the degassing function (Degassing settings menu). The filling should preferably take place over the
vessel connection valve (marking). If both the main and auxiliary vessels need filling, open the lockshield valve
on each vessel connection (flow and return). Make sure that the volume level detection is made by using the
volume sensor of the main vessel.
Disconnect the filling equipment.
Open all previously closed valves (seal) and bleed the pump(s).
Optionally the de-aeration function can be switched ON again.
The operational mode has been restored.
* There are 2 questions in this menu item. Only when these are confirmed, the reset takes place.
Caution: At the moment of restarting the system some logical errors may arouse that are self-acknowledging or
acknowledged.
9. Decommissioning, dismantling
At the end of the of the service life or at planned shut-down of the equipment, please make sure that the module
is separated from the power supply. The hydraulic system connections and top-up connections should be closed
o.
Caution: water areas should first be made pressureless and empty when the destination or re-use of system
water should be designated in conformity with the applicable rules. This water may be treated, contain anti-
freeze or other additives.
The designation of further processing of the construction parts should be carried out in agreement with the
required waste management service provider.

Table of Contents

Other manuals for flamco Flamcomat G4

Related product manuals