4.3 Temporary storage
If the system is to be assembled at a later stage:
Store components at a protected location, which is dry and free from dust
Damp conditions and frost can damage components, particularly electric ones!
4.4 Installation site
In order to make it easier to empty the dustbin, the emptying point and the ash
discharge system should be located level to each other
The door opening at the installation site should be large enough to let the dustbin
pass easily
⇨ See "Dimensions of ash transfer box for T4 / TX" [page 10]
⇨ See "Dimensions of ash transfer box for P4 Pellet" [page 11]
If the dustbin needs to be transported to the emptying point with a forklift, enough
room must be left at the installation site to let the forklift manoeuvre
Assembly
4
Temporary storage
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 15