EasyManua.ls Logo

Froling T4 - Assembling the Discharge Pipe and Supporting Post

Froling T4
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Replace the ash container with the ash transfer box
Push the lever down to lock the ash transfer box in place
Secure 2 double ball catches to the left and right of the boiler insulation using blind
rivets in the pre-drilled holes.
Replace the insulated doors with the cladding (provided)
Ensure that the tabs are placed correctly in the safety switch on the boiler
4.6.6 Assembling the discharge pipe and supporting post
Slide the ring seal over the flange on the pipe bend (A)
Using the tension ring, attach the straight pipe to the pipe bend (B)
Take the tension ring apart and attach the lower part
Then place the upper part of the tension ring and screw the two parts together
Attach the supporting post to the straight pipe using the pipe clamp
Optimum height: the pipe clamp should be fixed approx. 500 mm above the
tension ring
Assembly
4
Assembling the ash discharge system
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 23

Table of Contents

Related product manuals