1. Loosen the tension ring between the pipe bend and the ash transfer box
2. Remove the ash transfer box from the coreless screw
3. Empty the ash transfer box and reassemble the components in reverse order
4. Switch on the system
5. Ensure the coreless screw is working (sound/visual inspection)
Troubleshooting
6
Blockage in ash discharge on the P4 Pellet
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 39