Maintenance
2000966-386D Dash™ 3000/4000/5000 A-17
d. Select CHECK CALC IN PROGRESS > STOP to deflate the NBP cuff.
8. Repeat procedure for the BP 2/4 patient connector.
Alarm Verification
To verify the system alarm functions, use the following procedure.
1. Raise the heart rate limit until it is higher that the patient’s current heart rate.
2. Verify the following:
The audible alarm sounds the correct tone.
The heart rate in the ECG parameter window flashes in the correct color.
The alarm light flashes the correct color.
An alarm graph printed.
3. Silence the alarms and verify they react correctly.
4. Return the heart rate alarm settings to the original monitoring levels.
NOTE
For more information on alarms, refer to Chapter 4.

Table of Contents

Other manuals for GE Dash 5000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Dash 5000 and is the answer not in the manual?

GE Dash 5000 Specifications

General IconGeneral
BrandGE
ModelDash 5000
CategoryMedical Equipment
LanguageEnglish

Related product manuals