GE PROPRIETARY TO GE
D
IRECTION 5308917-100, REVISION 8 LOGIQ P3 SERVICE MANUAL
3-14 Section 3-5 - Completing the Installation
NOTE: Please ensure that the probe latch is in unlocked position before you connect the probe to the system.
NOTE: It is not necessary to turn OFF power to connect or disconnect a probe.
Figure 3-12 Connect the probe
Fig (A) Connecting the Probe Fig (B) Locking the Probe Lever