EasyManua.ls Logo

GE LOGIQ P3 PRO

GE LOGIQ P3 PRO
348 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE PROPRIETARY TO GE
D
IRECTION 5308917-100, REVISION 8 LOGIQ P3 SERVICE MANUAL
Chapter 8 Replacement Procedures 8-55
Section 8-5 USB Cable Set (FRU P/N: 5315039)
8-5-0-1 Tools
Common Phillips screwdrivers
8-5-0-2 Needed Manpower
1 persons, 15 minutes per cable
8-5-0-3 Preparations
Shutdown the system and switch off the main Circuit Breaker at the bottom rear side of the system.
8-5-0-4 Removal Procedure
1. Remove the covers and parts as applicable. Refer to the applicable section of this document.
2. Unplug the USB cable from both the ends and remove the cable from the machine.
8-5-0-5 Functional Checkout Procedure
See
Section
Functional Test Debrief Script
4-3-1 Power On/Boot Up
Proprietary Service Manual Direction 5308917-100, Section 8-5. Equipment passes all
required tests and is ready for use.
4-3-2 Power Off/ Shutdown

Table of Contents

Related product manuals