EasyManua.ls Logo

GE LOGIQ P6

GE LOGIQ P6
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 5245279, REVISION 3 LOGIQ™ P6/P6 PRO SERVICE MANUAL
4 - 36 Section 4-9 - Board Function Checks
10.)Activate probe. Refer to the 4-3-7-2 "Activating the probe" on page 4-9.
11.)Check the system basic functions. Refer to the 4-3-4 "System B/M-Mode Checks" and refer to the
4-3-5 "System CFM and PWD Checks" on page 4-7.
12.)Disconnect probe. Refer to the 4-3-7-4 "Disconnecting the probe" on page 4-9.
13.)Connect probe on port 2 and repeat step 8) ~ 10).
14.)Connect probe on port 3 and repeat step 8) ~ 10).
15.)All basic functions must show correct operation as described.

Table of Contents

Other manuals for GE LOGIQ P6

Related product manuals