EasyManua.ls Logo

GE LOGIQ P6

GE LOGIQ P6
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 5245279, REVISION 3 LOGIQ™ P6/P6 PRO SERVICE MANUAL
4 - 46 Section 4-9 - Board Function Checks
4-9-11 DTRX Cooler with heatsink Function Validation Procedure
1.) Turn on the system
2.) Check the basic function of system's different modes. Refer to the 4-3-4 "System B/M-Mode
Checks" on page 4-6 and refer to the 4-3-5 "System CFM and PWD Checks" on page 4-7.
Refer to the 10-5-2-1 "System Checks" on page 10-8.
4-9-12 ACPC II Assy set Function Validation Procedure
1.) Turn on the system. Refer to the 3-5-1 "Power On/Boot Up" on page 3-11 sequence to check AP950
Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to the Section 4-5 "Peripheral Checks" on page 4-21. All
peripheral must work correctly as described Section 4-5.

Table of Contents

Other manuals for GE LOGIQ P6

Related product manuals