DIRECTION 5245279, REVISION 3 LOGIQ™ P6/P6 PRO SERVICE MANUAL
Section 3-4 - Preparing for Installation 3-13
3-5-1-3 Power Up Sequence
NOTE: To enter the Maintenance Mode, select Maintenance button.
NOTE: Figure 3-11 on page 3-13 displays when Service Dongle inserted in Rear Panel.
NOTE: Put in the service password in the Password box.
3-5-2 Power Off/ Shutdown
NOTE: After turning off a system, wait at least ten seconds before turning it on again. The system may
not be able to boot if power is recycled too quickly.
3-5-2-1 Power Shutdown
1.) Press the ON/OFF
key at the front of the System. Refer to the Figure 3-9.
2.) Click the shutdown icon in the shutdown dialog box and wait until the system shutdown.
3.) Switch OFF the Main Circuit Breaker at the rear of the system refer to the Figure 3-8.
4.) Disconnect the Main Power Cable is necessary. For example : Relocating the scanner.
Figure 3-11 Start Application Window