GE HEALTHCARE
DIRECTION 5245279, REVISION 3 LOGIQ™ P6/P6 PRO SERVICE MANUAL
Section 10-3 - Maintenance Task Schedule 10 - 7
Section 10-5
System Maintenance
10-5-1 Preliminary Checks
The preliminary checks take about 15 minutes to perform. refer to the system user documentation
whenever necessary.
Table 10-6 System Checks
Step Item Description
1 Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
2 Paperwork
Fill in the top of the Ultrasound Inspection Certificate (see page 29). Note all probes and system
options.
3 Power up
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
power up to verify that no warning or error messages are displayed.
4Probes
Verify that the system properly recognizes all probes.
5 Displays
Verify proper display on the monitor and touch panel.
6Presets
Backup all customer presets on an CD-RW.