DIRECTION 5245279, REVISION 3 LOGIQ™ P6/P6 PRO SERVICE MANUAL
Section 10-6 - Electrical Safety Tests 10 - 27
10-6-9-5 Data Sheet for Transducer Source Leakage Current
The test passes when all readings measure less than the values shown in Table 10-15 and Table 10-
16. Record all data on the PM Inspection Certificate.
.
CAUTION
Equipment damage possibility. Never switch the Polarity and the status of Neutral when the unit
is powered ON. Be sure to turn the unit power OFF before switching them using the POLARITY
switch and/or the NEUTRAL switch. Otherwise, the unit may be damaged
Table 10-23 Typical Data Sheet For Transducer Source Leakage Current
Transducer Tested:
Unit Power
Tester Power Polarity
Switch
Tester GROUND or
NEUTRAL Switch Measurement
ON NORM OPEN
ON NORM CLOSED
ON REV OPEN
ON REV CLOSED
OFF NORM OPEN
OFF NORM CLOSED
OFF REV OPEN
OFF REV CLOSED

Table of Contents

Other manuals for GE LOGIQ P6

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P6 and is the answer not in the manual?

GE LOGIQ P6 Specifications

General IconGeneral
BrandGE
ModelLOGIQ P6
CategoryMedical Equipment
LanguageEnglish

Related product manuals