GEK-106237P MIFII Digital Feeder Relay 3
TABLE OF CONTENTS
5.2.3 THERMAL IMAGE SETTINGS (49) ................................................................... 5-4
5.2.4 AUTORECLOSER SETTINGS (79) ................................................................... 5-5
5.3 ADVANCED SETTINGS
5.3.1 PHASE / GROUND TOC SETTINGS (51P/ 51G) (GROUP 2) ......................... 5-8
5.3.2 PHASE / GROUND IOC SETTINGS (50P1/ 50P2/ 50G1/ 50G2) (GROUP 2) ( 5-8
5.3.3 THERMAL IMAGE SETTINGS (49) (GROUP 2) ............................................... 5-9
5.3.4 EVENTS AND OSCILLOGRAPHY MASKS (ONLY ENERVISTA MII SETUP) 5-10
5.3.5 OSCILLOGRAPHY MASKS............................................................................. 5-11
5.3.6 I2 COUNTER ................................................................................................... 5-11
5.3.7 BREAKER FAILURE TO OPEN....................................................................... 5-11
5.3.8 COLD LOAD PICKUP...................................................................................... 5-11
5.4 TIME SYNCHRONIZATION
6. I/0 CONFIGURATION 6.1 INPUT CONFIGURATION (FOR OPTIONS 1 AND 2)
6.1.1 DESCRIPTION OF INPUTS .............................................................................. 6-1
6.1.2 INPUT ELEMENTS ............................................................................................ 6-4
6.2 OUTPUTS AND LEDS CONFIGURATION (FOR OPTIONS 1 AND 2)
6.2.1 DESCRIPTION OF OUTPUTS AND LEDS ....................................................... 6-5
6.2.2 OUTPUT AND LED ELEMENTS ....................................................................... 6-7
7. LOGIC CONFIGURATION
(ONLY OPTION 2 MODELS)
7.1 LOGIC DESCRIPTION
7.2 LOGIC ELEMENTS
8. KEYPAD AND DISPLAY 8.1 DESCRIPTION
8.2 FACEPLATE KEYPAD
8.3 ALPHANUMERIC DISPLAY AND LEDS
8.3.1 DISPLAY ............................................................................................................ 8-3
8.3.2 LEDS.................................................................................................................. 8-3
8.4 OPERATIONS
8.4.1 ONE KEY OPERATION AND LAST TRIP DATA............................................... 8-5
8.4.2 HMI PASSWORD............................................................................................... 8-6
8.5 MENU TREE
9. RELAY COMMISSIONING 9.1 VISUAL INSPECTION
9.2 COMMENTS ON THE TEST EQUIPMENT
9.3 WIRING AND NECESSARY EQUIPMENT
9.4 TARGET LEDS
9.5 POWER SUPPLY TEST
9.6 COMMUNICATIONS
9.7 RELAY SETTING
9.8 CONTACT INPUTS
9.9 CONTACT OUTPUTS
9.10 RELAY METERING
9.10.1 CURRENT METERING.................................................................................... 9-10