EasyManua.ls Logo

GE MS-6001B - Page 80

GE MS-6001B
370 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection and Maintenance — GEK 107048Standard Practices
SP-54
MS-6001B DLN-1 — Major Inspection Recommended Spare Parts (Cont’d)
Recommended
Quantity
PIPING ARRANGEMENT COOLING & SEALING AIR (ML0909) (Cont’d)
20. Union, Tube 2
21. Union, Tube 4
22. Union, Tube 7
23. Tee, Union Tube 2
24. Nut, Self Locking *5
25. Nut, Self Locking *6
26. Nut, Self Locking *6
NOZZLE ARRANGEMENT, TURBINE FIRST STAGE (ML1401)
1. First Stage Nozzle Arrangement 1
RING RETAINING, TURBINE NOZZLE FIRST STAGE (ML1401)
1. Insert, Wire Locking (Helicoil) 4
2. Insert, Wire Locking (Helicoil) 9
3. Wire, Insert (Helicoil) 30
4. Wire, Insert (Helicoil) 1
RING ASSEMBLY, SUPPORT FIRST STAGE NOZZLE (ML1403)
1. Support Ring First Stage 1
NOZZLE ARRANGEMENT, TURBINE SECOND STAGE (ML1402)
1. Second Stage Nozzle Arrangement 1
NOZZLE ARRANGEMENT, TURBINE THIRD STAGE (ML1409)
1. Third Stage Nozzle Arrangement 1
CASE ASSEMBLY COMPRESSOR INLET & NO. 1 BEARING (ML0801)
1. Liner Bearing No. 1 1
2. Oil Deflector No. 1 Bearing 1
3. Stationary Oil Seal Assembly 1
4. Forward Stationary Oil Seal 1
5. Air Seal Assembly 1
6. Pin, Shoulder, Headless 1
7. Screw, Flat Head (0.375–16 x 0.750) 2
8. Washer 2
9. Pin, Dowel 1
BEARING NO. 2 ASSEMBLY (ML1502)
1. Liner Bearing No. 2 1

Table of Contents