EasyManua.ls Logo

GE Multilin W650 - Page 595

GE Multilin W650
622 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GEK-113032A W650 Wind Generator Protection System D-7
APPENDIX D D.5 IEC 60870-5-104 POINT LIST
D
Table D–1: OPERATIONS:
Table D–2: CLOCK SYNCHRONIZATION:
The date in the answer is the same as the received in the command.
The relay date is synchronized after performing this command.
Table D–3: RESET OF PROCESS
QRP_RESET_GRAL: General reset of process.
Table D–4: ACQUISITION OF TRANSMISSION DELAY:
The date in the answer is the same as the received in the command.
OPERATIONS
POINT DESCRIPTION
C_SC_NA_1
3000 – 3011 Command OFF
3000 – 3011 Command ON
CLOCK SYNCHRONIZATION
POINT DESCRIPTION
C_SC_NA_1
0 Set Date
RESET OF PROCESS
POINT DESCRIPTION
C_RP_NA_1
0 Reset of Process
DELAY ADQUISITION
POINT DESCRIPTION
C_CS_NA_1
0 Delay Acquisition

Table of Contents