223 Sample Changer User’s Guide 2-1
Installation 2
This chapter details the steps for setting up the 223 Sample Changer, which includes:
• Arm Locking Screw Removal
• Vertical Arm Installation
• Probe Installation
• Rinse Station and Port Bar Installation
• Tray Installation
• Rack Installation
• Accessory Installation
• Rear Panel Connections
The diagram below shows a possible configuration of the sample changer.