EasyManua.ls Logo

Global 5120 - 2.7 Customer Load Wiring

Global 5120
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GlobalPowerTechnologies 2-10
5120
1) Toadjustthefuelpressure,removethecoverontheregulatorandloosenthelocknut.
2) Turntheadjustingscrew(clockwisetoincreasepressure)untiltherequiredchangein
pressureisobtained.
WARNING: Do not exceed the following values:
Natural Gas: 31 kPa (4.5 psi)
Propane: 45 kPa (6.5 psi)
3) Waitatleast10minutesbeforemeasuringV
set
.IftheTEGstilldoesnotreachV
set
value
thenaproblemexistswithoneoftheTEG’ssystems.Seesection3.3,troubleshooting,
forevaluation.
4) Replacethecoveronthefuelregulator.
2.7 Customer Load Wiring
1) Useonlycopperwire,properlysizedfortheloadcurrent.
2) Bringthecustomerloadwiresthroughthestrainreliefbushing(locatedontheTEGcab-
inetoor).AllowenoughwiretoconnecttotheterminalblockTB-1.
3) Tightenthescrewsonthestrainreliefbushing.
4) Connectthecustomerloadwirestoterminals5(-)and6(+).
Figure 11ChangeinV
set
vsAirShutterSetting

Table of Contents

Related product manuals