2-5
OPERATION
2.2.5 Bump Due Date (Option)
This congurable option is disabled by default but can be
congured to either, indicate briey that bump test is due, as
illustrated in Fig. 2-5, indicate that bump test is overdue then
pause awaiting user acceptance, as illustrated in Fig. 2-6, or
force the user to switch instrument OFF when overdue.
Fig. 2-5 Bump Due Date
Fig. 2-6 Bump Overdue
To continue instrument operation, press the Right Hand (RH)
button once to acknowledge bump test is overdue.
To abort the warm-up routine and automatically switch the
instrument OFF, press the Left Hand (LH) button once.