EasyManua.ls Logo

GMI PS241 - 2.2.5 Bump Due Date (Option)

GMI PS241
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-5
OPERATION
2.2.5 Bump Due Date (Option)
This congurable option is disabled by default but can be
congured to either, indicate briey that bump test is due, as
illustrated in Fig. 2-5, indicate that bump test is overdue then
pause awaiting user acceptance, as illustrated in Fig. 2-6, or
force the user to switch instrument OFF when overdue.
Fig. 2-5 Bump Due Date
Fig. 2-6 Bump Overdue
To continue instrument operation, press the Right Hand (RH)
button once to acknowledge bump test is overdue.
To abort the warm-up routine and automatically switch the
instrument OFF, press the Left Hand (LH) button once.

Table of Contents

Related product manuals