EasyManua.ls Logo

Hach PAT700 - Mechanical Installation

Hach PAT700
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
N O T I C E
To prevent measurement error, make sure that the instrument is attached in an upright, level position.
For environmental and sample requirements, refer to Specifications on page 5
.
Put the instrument in a location that has access for operation, service and calibration.
Install the instrument near the water system sample point.
Make sure that there is a minimum of 30.48 cm (12 in.) of clearance for the enclosure doors to
open. Refer to Figure 2 on page 11.
Make sure that there is sufficient clearance to access the power switch, plumbing and electrical
connections on the end panels. Refer to Figure 2 on page 11.
Mechanical installation
Attach the instrument to a wall
W A R N I N G
Personal injury hazard. Make sure that the wall mounting is able to hold 4 times the weight of the
equipment.
Install the instrument on a wall or other stable, flat surface. Refer to Figure 2 for dimensions. Refer to
Figure 3 for installation.
Use user-supplied 8-mm (5/16-in.) diameter screws or bolts and nuts to attach the instrument to a
wall or other flat, rigid surface. Use hardware that is approved for a process environment.
Do not attach bolts to separate girders, beams or wall studs that can move independently.
Do not attach the instrument to a surface that has vibration.
10 English

Table of Contents

Related product manuals