EasyManua.ls Logo

Hach PAT700 - Attach to Dual Pipes

Hach PAT700
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 3 Wall mount
Attach the instrument to dual pipes
Refer to Figure 2 on page 11 for dimensions. Refer to Figure 4 for installation.
Attach the analyzer mounting bracket to two instrument pipes that are attached to a common
surface. Do not attach the instrument to two instrument pipes that could move independently.
Use pipes that extend at least 254 mm (10 in.) from the same rigid base.
Use pipes with a diameter of 50.8 mm (2 in.) or less.
Use four user-supplied 5/16-inch U-bolts (two for each 2-inch pipe) and eight user-supplied
matching nuts. Use U-bolts and nuts that can withstand the process environment.
Use U-bolts and nuts that do not extend more than 15 mm (0.60 in.) from the inside of the bracket.
Figure 4 Pipe installation
12 English

Table of Contents

Related product manuals