Figure 7 Wiring for power
1 Line 2 Neutral 3 Ground
Table 10 AC wiring information
Connection Color—North America Color—EU
Hot (L) Black Brown
Neutral (N) White Blue
Protective earth ground Green Green and yellow
Plumbing
Plumb the instrument
W A R N I N G
Chemical exposure hazard. Obey laboratory safety procedures and wear all of the personal protective
equipment appropriate to the chemicals that are handled. Refer to the current safety data sheets
(MSDS/SDS) for safety protocols.
Refer to Figure 8 and the steps in this procedure to plumb the instrument.
User-supplied items:
Wrench, 7/16-in.
Isolation valve
Tubing, ¼-in. OD polypropylene, PFA or 316 stainless steel for inlet and outlet
1. Install the isolation valve on the process pipe. Open and close the isolation valve several times to
let water into the system to remove debris.
2. Push the tube from the isolation valve into the WATER IN port until it stops. Do not crimp or bend
the tubing.
3. Tighten the compression nut on the WATER IN port by hand. Make a mark on the compression
nut and tube for reference.
Note: For the dual stream model, do step 2 and 3 for the second WATER IN port.
4. Tighten the compression nut another 1¼ turns.