EasyManua.ls Logo

Hach PAT700 - Startup and Basic Operation; Startup Procedures

Hach PAT700
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Startup
Connect to power
After plumbing and wiring are complete, connect the instrument to power. For the location of the
power switch and power cord, refer to Figure 5 on page
13.
1. Connect the power cord to a power outlet with a safety ground.
2. Toggle the power switch to on.
3. Make sure that the startup screen shows on the display.
Set the sample flow rate
Adjust the flow rate before initial operation. Refer to Specifications on page 5 for sample
requirements. For hot water applications, a flow rate of 60 mL/minute is recommended.
1. Push << to show the sliding menu.
2. Push RUN MODE.
3. Select Standby.
Note: In Standby, water continues to flow through the instrument.
4. Use a graduated cylinder to measure the amount of water that drains from the instrument in
15 seconds.
5. Use the flow control valve to adjust the flow rate. Refer to Figure 10.
Figure 10 Flow control valve
1 Flow control valve 2 Water filter
Basic operation
Select the run mode
1. Push << to show the sliding menu.
2. Push RUN MODE.
3. Select an operation. Refer to Run modes on page 52.
Option Description
Online TOC Monitor TOC continuously in process
Conductivity Monitor conductivity continuously in process
CIP validation Start the "Clean in Place" validation
English 23

Table of Contents

Related product manuals