Measurement Method
6.1 Checking Three-phase Systems
57
Before measuring, make sure you read the information
on precautions for using this device and connection
methods. For screen setting details, See the Instruction
Manual (CD-R version).
Check that the power distribution board you are using
has a 400 V three-phase 3-wire configuration.
Measurement
location
Three-phase 3-wire 400 V power line on a distribution board (50
Hz, 50 A load)
Application • To connect the 3196 to the measured power line while viewing
the connection diagram on the screen
• To check whether the connection is correct on the vector screen
• To check the three-phase voltage and three-phase current wave-
forms
• To check the voltage unbalance factor and current unbalance
factor
Measurement Method 6
6.1 Checking Three-phase Systems
1.
Measurement preparations
Required for connection:
• 3196 + 9458 AC ADAPTER +
9459 BATTERY PACK
• 9438-02 VOLTAGE CORD
(One cord each of red, yellow, and
blue, and three black cords.)
• 9661 CLAMP ON SENSOR, 3 each
When using the three-phase connec-
tion adapter
• 9264-01 WIRING
ADAPTER(3P3W3M)
• 9438-02 VOLTAGE CORD
(One cord each of red, yellow, and
blue.)
Breaker for power
distribution
Load side
Source side
Power dis-
tribution
board
A B C
ON