EasyManua.ls Logo

Honeywell 900 - Table 27 Details of Lead or Reserve CPU Diagnostics Error Status Messages

Honeywell 900
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Main Menu
Lead/Reserve CPU Diagnostics Diagnostics
Revision 9 900 Control Station User Guide 57
May 2014
Table 27 Details of Lead or Reserve CPU diagnostics error status messages
Class Status Possible Cause Controller Action Fix
RESERVE
STATUS
RESERVE
AVAILABLE
Normal operation N/A N/A
RESERVE NOT
AVAILABLE
1. Reserve not installed
in rack.
2. Power not applied to
reserve CPU
3. Neither lead nor
reserve CPU has a
valid configuration
database
4. Firmware mismatch
(lead and reserve
CPUs have different
firmware revisions
5. Database not
synchronized with
the lead
The lead controller
will continue to
control the process,
but failover is not
possible.
Install reserve CPU
Apply power to reserve CPU
Download a configuration and cold
start the controller
Perform a firmware upgrade so
both CPUs have the same version
Replace the reserve CPU. If this
doesnt help, replace the lead
CPU. If this doesnt help, replace
the backplane.

Table of Contents

Related product manuals