Setup 27
WARNING: To reduce the risk of electric shock or damage to the equipment:
Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.
Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.
Unplug the power cord from the power supply to disconnect power to the equipment.
Do not route the power cord where it can be walked on or pinched by items placed against
it. Pay particular attention to the plug, electrical outlet, and the point where the cord extends
from the server.
Installing the server into a rack
To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship
with the rack hardware kit.
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions
website (http://www.racksolutions.com/hp). Follow the server-specific instructions on the website to
install the rack brackets.
Use the following information when connecting peripheral cables and power cords to the server.
WARNING:
This server is very heavy. To reduce the risk of personal injury or damage to the
equipment:
Observe local occupational health and safety requirements and guidelines for manual
material handling.
Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. Hewlett Packard Enterprise recommends that a
minimum of two people are required for all rack server installations. A third person may be
required to help align the server if the server is installed higher than chest level.
Use caution when installing the server in or removing the server from the rack; it is unstable
when not fastened to the rails.
CAUTION:
Always plan the rack installation so that the heaviest item is on the bottom of the
rack. Install the heaviest item first, and continue to populate the rack from the bottom to the top.
To install the server in a Hewlett Packard Enterprise, Compaq-branded, Telco, or a third-party rack:
1. Prepare the server for rack installation by installing the HPE 100kg Sliding Shelf option kit (PN
234672-B21). For instructions, see the option kit documentation.
2. Connect peripheral devices to the server. For information on identifying connectors, see "Rear panel
components (on page 8)."
WARNING: To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
telephone or telecommunications connectors into RJ-45 connectors.
3. Connect each power cord to the server.
4. Connect each power cord to the power source.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP HPE ProLiant ML110 Gen9 and is the answer not in the manual?

HP HPE ProLiant ML110 Gen9 Specifications

General IconGeneral
Processor Sockets1
Memory Slots8 DIMM slots
ProcessorIntel Xeon E5-2600 v3/v4
ChipsetIntel C610
MemoryDDR4 SmartMemory
StorageUp to 8 LFF or 16 SFF drives
Storage ControllerDynamic Smart Array B140i or P440ar
RAID SupportRAID 0, 1, 5, 10 with optional controller
Network1GbE
Expansion SlotsPCIe slots
Form FactorTower
Operating System SupportWindows Server, Red Hat Enterprise Linux, SUSE Linux Enterprise Server, VMware
Maximum Internal Storage16 TB